Construction Phase Plan
Site induction record
COSHH assessment
RAMS
150document typesbuilt for your sitePermits to work, toolbox talks, inspection checklists, registers and more.

Health & safety documents for UK construction

Your whole H&S pack, built for your site in ten minutes.

RAMS, COSHH and your Construction Phase Plan, built from the work you do and the equipment you use. You check it, sign it, take it to site.

Free plan: 1 RAMS and 1 COSHH assessment. No card needed.

Start free See sample documents (PDF)

Free plan: 1 RAMS and 1 COSHH assessment. No card needed.

Construction Phase Plan
Site induction record
COSHH assessment
RAMS
150document typesbuilt for your sitePermits to work, toolbox talks, inspection checklists, registers and more.
Built on UK law and HSE guidance: 1,500+ official sources
Your data is encrypted and stored in the EU
Kept up to date when the rules change

An inspector can turn up any day. Are your documents ready?

Every construction project needs a construction phase plan before work starts, whatever its size.

When the inspector turns up

No warning. No time to start writing. HSE inspectors visit without notice. If they find you in material breach of health and safety law, you pay £188 an hour for the time HSE spends pointing out what you got wrong. Your documents are in your Document Vault, ready to show.

If something goes wrong

Breaking health and safety law is a criminal offence. Fines have no upper limit. A director or manager can be prosecuted personally where the offence happened with their consent or through their neglect. Every document shows the law it is based on.

At the gate

Your RAMS comes back. The team waits. Rejected paperwork is a lost day for the whole crew. Tick what you do and what you use, and your RAMS comes out built for that site. Proper RAMS ready before the gate.

Sources: Health and Safety at Work etc. Act 1974, section 33, section 37 and Schedule 3A; CDM 2015, regulations 12 and 15; HSE Fee for Intervention rate. General information, not legal advice.

How it works

A few simple clicks
1

Enter general project data

Address, names, companies, roles, dates.

2

Equipment

Tick the equipment you use on site: excavators, tippers, saws, scaffolding.

3

Scope of works

Tick what you do: roofing, excavations, joinery.

4

Ready documents

Download and send. Documents built for your site, ready to sign and to show at an inspection.

Complete documentation for your site.

You choose the works and equipment – we match the required documents.

See sample documents (PDF)
Core documents

CPP (Construction Phase Plan)

The plan every site needs under CDM 2015, built from your project details. On Principal Contractor plans.

RAMS (Risk Assessment & Method Statements)

Specific to your site, your works and your equipment. Method statements in the order the work happens on site.

COSHH assessment

The system works out which substances your works involve and matches the safety data sheets. You add the products you actually use: dust, adhesives, paints, solvents.

With electronic signatures

Forms and training

Training, forms and questionnaires. Workers sign on screen, in their own language. The signed record stays in your account.

Permits to work

Permits for hot works, confined spaces and work at height, generated from the works you selected.

CDM Creator logo

And many more

About 150 types of document, each built for your works and equipment. Every document comes with a short note on when and how to use it.

Digital signatures

Collect signatures on screen.

Every document signed electronically by your workers. You'll never lose documents again. Signed records are evidence that your workers were briefed, which matters if a claim is made.

Document Vault

All your H&S paperwork in one Document Vault

Every RAMS, CPP and training form in one place. Log in and pick the project.

Start free

Created for professionals

Start free

Contractor (Trade Contractor)

“I just want to get on site and do my job.”
You don't need to know how a RAMS is written. Tick what you do and what you work with. The document comes out ready to check and sign.

Principal Contractor

“I manage the site and the subcontractors.”
Your Construction Phase Plan, RAMS and COSHH in one format, with your workers' and subcontractors' signatures on them.

H&S Specialist / Consultant

“I look after documentation for many clients.”
Leave document production to CDM Creator and spend your time on advice. Edit every document before it goes out, under your own logo. We start with a 20-minute online demo, so we can match the plan to your clients and your team.

What's behind every document

You stay responsible for what you sign, so you should know what you are signing.

A fixed register of hazards and controls

CDM Creator doesn't write from memory. You tick your works and equipment, and it selects the documents your job needs. The same answers give the same document.

Built around the regulations

Prepared in accordance with the CDM 2015 regulations, HSE guidance L153 and the other health and safety regulations that apply to your works, from COSHH to work at height. Behind them is a library of more than 1,500 official sources: UK law, HSE guidance and industry codes.

Based on real site documents

Built on documents used by health and safety consultants on real UK sites, and updated when health and safety law or HSE guidance changes.

You check, you sign

AI is used in one optional place only, drafting method statement steps, which you review and edit. Every document needs your check and signature before it is used.

Pricing

Choose your plan

Start on the free plan. Move up when you need more documents or more projects.

£0

no card needed

Free

See CDM Creator in action. No commitment, no card needed.

1 user
Start free
1 RAMS document
1 COSHH assessment

£39

a month

Contractor

For subcontractors: electricians, plumbers, fit-out companies and specialist trade teams.

1 user
Unlimited RAMS and COSHH
Choose this plan
Unlimited RAMS and COSHH
CPP generator
Your own logo on documents
For principal contractors

£99

a month

Principal Contractor

For construction companies running their own builds and managing the site.

Up to 2 users
Up to 5 projects (CPPs) a year
Choose this plan
Unlimited RAMS and COSHH

£149

a month

Principal Contractor PLUS

For mid-size and larger construction companies running several builds at once.

Up to 3 users
Up to 10 projects (CPPs) a year
Choose this plan
Unlimited RAMS and COSHH

ProMax (Consultant)

For H&S consultancies managing multiple clients, and for larger contractors and developers.

Up to 5 users
Unlimited projects (CPPs)
Price on request Quoted to your needs
Book a 20-minute demo

Need more projects than your plan allows? Move up to the next plan at any time. Every plan includes automatic updates when health and safety law or HSE guidance changes, encrypted data and an interface in six languages: English, Polish, Ukrainian, Romanian, Punjabi and Urdu.

Frequently Asked Questions

From your answers and a fixed register of hazards and controls. Each document is prepared in accordance with CDM 2015, HSE guidance L153 and the other regulations that apply to your works, such as COSHH 2002 and the Work at Height Regulations 2005, and it shows the law it is based on. Behind them is a library of more than 1,500 official sources. The documents are aligned with the SSIP Core Criteria used by CHAS, SafeContractor and Constructionline. AI is used in one optional place only, drafting method statement steps, which you review and edit.
Construction workers on a site

Contact us

We are here for you to answer every question

We usually reply within 24 hours.

0/1000